1 - WORKS
  • Augmentation of reservoir capacity by about 1.7 million cubic meters (14%) annually, for the Alexandroupolis metropolitan area
  • Optimisation of existing large-scale water infrastructure with innovative and reliable technology of free standing gates
  • Optimisation of existing water supply networks in remote settlements to ensure good water quality and decrease water losses
1 technical aspects